Commercial Case Studies
Sunrise Children’s Hospital Cooling Tower
Installer
HydroFLOW West.
Customer
Sunrise Children’s Hospital – Las Vegas NV.
Application
Cooling Tower.
Installed Unit
HydroFLOW Industrial Unit.
Chemicals
Biocide and antiscalant chemicals.
Success Factors
Reduce limescale and chemical used.
Results
- After five months of the cooling tower being chemical-free, there is no hard scale accumulation and the Heterotrophic biological count is well under 1,000 CFU/ML. We’ve also noticed that our chiller is operating more efficiently due to scale and biofilm removal.
- The HydroFLOW water conditioning device helped in substantial cost savings associated with reduced chemical consumption, maintenance, electricity and water usage.
For the full report please click on the PDF.