Industrial Case Studies
Massive Texas Factory

Installer
EcoTech Solutions
Customer
A 5.2 million square foot equipment manufacturer in Texas with over 7,000 employees.
Application
Contribute to water savings to spare the facility’s well and free up capacity in the onsite wastewater treatment plant, which is over capacity 8 months out of the year (causing fines).
Installed Units
A HydroFLOW i-14″ Custom unit on the chiller return line and a HydroFLOW i100 on the sheet metal washer’s recirculating line.
Results
- After 6 months, the chiller tubes showed no sign of scale or biofilm accumulation while operating at 4,500 μS/cm, with 75% chemical reduction. Approach temperatures were maintained within 1 degree.
- HydroFLOW removed significant amounts scale from the tower fill material throughout the evaluation period.
- The sheet metal washer showed significantly less scaling, increasing the time between manual cleanouts.
- By reducing scaling in the sheet metal washer, heat transfer was improved leading to an ROI of less than 1 year.
- Due to the water savings that can be achieved with HydroFLOW, the customer may be able to delay a multi-million-dollar wastewater treatment plant upgrade for another 3-5 years.
- The customer plans to install more HydroFLOW units throughout the facility, including 7 additional cooling tower systems