Industrial Case Studies

Steel Company Spray Bar System – Scale

INSTALLER

HydroFLOW Canada.

 

CUSTOMER

Steel manufacturing and processing facility located in Ontario, Canada

 

APPLICATION 

Spray Bar System – Galvanizing Line – Cooling Spray Bars.

 

INSTALLED UNIT

HydroFLOW i100” – on the output of the pump.

 

BACKGROUND

Due to the high concentration of TDS and contaminants in the galvanizing line cleaning spray system the spray nozzles would scale up and clog requiring manual take down and cleaning. This clogging would typically happen in 3 weeks. 

 

CONCLUSION

After the end of the first 3 week cycle sprays were inspected and found to have “nearly no buildup to cause clogging” and any buildup found to occur was a loose, fluffier material instead of a concrete like buildup. 

 

 

For the full PDF please click on the link.

View PDF version